Roadway Prep and Start of Headwall Construction

Posted on August 3, 2018 at 2:33 PM by Julie Sutor

This week, crews have been preparing the roadway for the new layer of asphalt, from Whispering Pines Ranch Road to Royal Coachman. They have also started construction of a concrete headwall on the west side of Cove Boulevard, which necessitated lowering the water level in the pond. At the completion of this project, the water will be restored to its original level. This work requires a Construction Dewatering Permit and Construction Stormwater Discharge Permit, both of which we obtained from the Colorado Department of Public Health and Environment. These permits require that we have solid plans to prevent contamination of waterways, per the Clean Water Act.

Next week, we will see the first layer of new pavement placed on the prepared section of roadway, and headwall construction will continue at the pond. Drivers will continue to see single-lane closures with flaggers. Thank you for your patience and cooperation during this construction; please drive safely.