Sign up to receive a text message or email when new bids are added!
Bid Title: SCP21-02 Boreas Pass and Baldy Road Reconstruction
Category: Road and Bridge
Status: Open

Description:
The Project includes the following work:
• Full depth reclamation of roadway to include pulverizing existing asphalt and mixing with subgrade material to a depth of six and seven-inches, re-grading and preparing for asphalt pavement surfacing.
• Provide, place and compact approximately 6,500 LF of asphalt pavement surfacing to a depth of 5-inches.
• Remove and Replace approximately 2,500 lineal feet of Guardrail w 10 end sections.
• Remove and Replace multiple 18 and 24 inch diameter corrugated metal culvert pipe.
• Perform all work in accordance with the plans and specifications provided.
Publication Date/Time:
4/30/2021 8:00 AM
Publication Information:
Summit County Journal, Summit Daily News
Closing Date/Time:
5/20/2021 10:00 AM
Submittal Information:
Bids will be received electronically emailed to Eric.Cottingham@SummitCountyCo.gov
Bid Opening Information:
Thursday, 5/20/2021, 10:00 AM
Contact Person:
Eric Cottingham, Asset Technician
Eric.Cottingham@SummitCountyCo.gov
Plan & Spec Available:
http://www.co.summit.co.us/Bids.aspx
Business Hours:
M-F, 7:30 AM to 4:00 PM
Miscellaneous:
Bids will be received electronically emailed to Eric.Cottingham@SummitCountyCo.gov; or sent by courier to Summit County Road & Bridge Department, 37 Peak One Dr., SCR 1005, Frisco, CO 80443; or mailed to Summit County Road & Bridge Department, P.O. Box 626, Frisco, CO 80443.
Related Documents:

Return To Main Bid Postings Page